Prep for Next TWS (10-26-2024)

 To Do’s This Week

1.  Seal some toys (65)

2.  Spray some toys (237)

3.  Make some Basketball Game posts (cut/round over one end/cut slot in other)

4.  Spray hoop sub-assemblies (100)

5.  Attach posts to bases – secure with tiny wedges (100)

6.  Sand posts flush with bottom of base (100).

Photos

Seal toys (10-19-2024) – two boxes (65 toys)

Make some Basketball Game posts /(10-21-2024)

Spray toys (10-21-2024): 237 toys

Spray hoop sub assemblies (100) (10-21-2024)

Load sealed and sprayed toys (10-21-2024)

Fun times for Kathie (10-20-2024)

Attach posts to bases (100) – 10-23-2024

Posts are secured to bases with small wedges.

The posts will be sanded flush with the bases when the glue is dry.

Posts have been sanded flush (10-24-2024).  Boxes were loaded into the truck.  
Hoop subassemblies will be attached to bases this weekend.

Turtle Banks – Rick is drilling holes in the plexiglass covers for the Turtle banks.

The covers are made from sheets of Plexiglas using the CNC router.

. 

Here’s the jig used to securely hold the covers for drilling.

Exotic wood – Zebra Wood – used for a back board
Chalk boards

Pat Graves is adding the chalk paint to the basic birch chalk boards.