Kathie and Ron put wheels on sanded car bodies.
Bob and Grant hooked up a drill press donated by Grant; Grant hooked up a Ryobi table saw donated by Grant.
Lon used Jig SK001 (jig for drilling holes for the dowel in the base and backboard) to drill 1/2 ” holes to accept basketball pole (dowel). Checked fit of dowels in backboard and base. Found a discrepancy in depth of some holes, so we will re-drill some holes and use final assembly jig to check for proper hole depth. Basketball game parts count: 100 bases, 96 backboards, 60 dowels. Grant brought in material for launchers. Bob will cut the stock and add the .087″ slot to accept Wendys spoons. Will need 3 more boards at 5′ each to make 100 launchers. J&D Woodworking is making the basketball hoops using their CNC router. Bob and Kathie will begin making the ball/string sets.
Grant brought in ten cup and ball game prototypes. Bob will install strings and balls when 3/4 inch balls ordered by Roger are received from Casey’s.
